Location Wickham, WA

Services Modular Housing

Duration 3 Months

Client Aussie Modular Solutions

Grounded Construction were contracted by Aussie Modular Solutions to complete the installation of 30 modular houses for the Rio Tinto Wickham Housing Project.

The 30 houses consisted of two configurations and they were:

  • 18 x 3 bedrooms and 2 bathrooms
  • 12 x 4 bedrooms and 2 bathrooms

The scope of work included:

  • Placement and landing of each house
  • Internal and external complexing of the buildings
  • Plumbing and electrical interfloor connections
  • Transit repairs to buildings

 

 

 

Contact


Grounded Construction Group Pty Ltd

08 9321 3398
Suite 7, Level 3
1111 Hay Street
West Perth, WA 6005

ABN 69 166 112 429

Mid-West Depot


418 Robinson Street, Carnarvon, WA 6701