Grounded Construction Group was engaged by Rio Tinto for the WADF Installation of the EPCM site office at Deposit F. The scope of works included:

  • 12m x 12m office facility for use by the engineer’s site team Installation of a production hub.
  • Transportable buildings at Deposit F.
  • Office building: 12m x 18m.
  • Ice room: 8.4m x 3.3m.
  • Locker room: 12m x 6m.
  • ERT office/store: 6m x 3m.
  • Crib room: 12m x 12m.
  • Ablution block: 12m x 3m.
  • Driver’s hut at HV refuel: 3m x 3m.

Share

  • Location Eastern Pilbara region, Northwest of Newman, WA.
  • Services Installation
  • Client DTMT