Grounded lands Rio Tinto Cape Lambert Build and Decommission

Sunday, June 15, 2014

 

Grounded Construction Group were engaged to complete the demobilisation of a 12 x 21m (7 floors) temporary office building from the Rio Tinto Cape Lambert site on behalf of GCS Hire.

IMG_4124a
We were required to decomplex the building and decommission all electrical and plumbing connections prior to separating each floor. Each floor was transit sheeted ready for transport and craned onto trucks along with the concrete blocks used under each building.
The operation was completed within a 5 day period thereby minimising costs and downtime for our client.