Port Hedland Power Station

Tuesday, July 1, 2014

 

Grounded Construction Group were engaged to decommission onsite temporary buildings at the Port Hedland Power Station.

The project included decommissioning all electrical and plumbing services to the buildings and preparing them for transport. Grounded Construction organised cranage onto trucks and transport to their new location.

Rio Tinto Cape Lambert

Tuesday, July 1, 2014

 

Grounded Construction Group were engaged to complete the demobilisation of a 12 x 21m (7 floors) temporary office building from the Rio Tinto Cape Lambert site on behalf of GCS Hire.

We were required to decomplex the building and decommission all electrical and plumbing connections prior to separating each floor. Each floor was transit sheeted ready for transport and craned onto trucks along with the concrete blocks used under each building.

Rio Tinto HD4

Friday, June 13, 2014

 

Temporary buildings relocation. The Hope Downs mine is an iron ore mine located in the Pilbara region of WA 100 kilometres northwest of Newman.

  • GCS temporary office buildings

Contact


Grounded Construction Group Pty Ltd

08 9321 3398
Suite 7, Level 3
1111 Hay Street
West Perth, WA 6005

ABN 69 166 112 429

Mid-West Depot


418 Robinson Street, Carnarvon, WA 6701