Non Processing Infrastructure

In addition to the processing and camp infrastructure for the Iluka Resources Dandaragan project, Grounded were requested to build administration, storage and wastage facilities. The scope of works included:

  • Design, construct and refurbishment of the site infrastructure area and utilities including service connection an commissioning
  • Stormwater drainage design to local council regulatory requirements for the proposed impervious areas including ground level, end of line civil storage, connection points for hydraulic consultant’s roof drainage design
  • Non-destructive overland flood route design for the site drainage system as per relevant Australian standards

Share

  • Location Cataby
  • Services Refurbishment
  • Client Iluka Resources