Non Processing Infrastructure

  • Design, construct and refurbishment of the site infrastructure area and utilities including service connection an commissioning
  • Stormwater drainage design to local council regulatory requirements for the proposed impervious areas including ground level, end of line civil storage, connection points for hydraulic consultant’s roof drainage design
  • Non-destructive overland flood route design for the site drainage system as per relevant Australian standards

Share

  • Location Cataby
  • Services Refurbishment
  • Client Iluka Resources