Rio Tinto

Brockman 2 Transit Facility

all projects

Location

Brockman 2

Client

Rio Tinto

Grounded has successfully completed the installation of a new lounge, locker, and 56 shower Transit Facility for Rio Tinto. The new facility provides outgoing staff members from the Brockman 2 Village the ability to comfortably prepare for their return trip home.

Specifications included:

  • To create a design that strongly complements and recognises the traditional landowners of the region
  • Detailed earthworks
  • Concrete pads and pavement linking the facility to the existing camp
  • Structural steel and FRP covered breezeway
  • Structural steel bus stop
  • Structural steel shelters and staircases
  • In ground electrical and hydraulic services connecting the facility with existing services
  • Landscaping and swales to disperse stormwater

View Project