Grounded has successfully completed the installation of a new lounge, locker, and 56 shower Transit Facility for Rio Tinto. The new facility provides outgoing staff members from the Brockman 2 Village the ability to comfortably prepare for their return trip home.
Specifications included:
- To create a design that strongly complements and recognises the traditional landowners of the region
- Detailed earthworks
- Concrete pads and pavement linking the facility to the existing camp
- Structural steel and FRP covered breezeway
- Structural steel bus stop
- Structural steel shelters and staircases
- In ground electrical and hydraulic services connecting the facility with existing services
- Landscaping and swales to disperse stormwater