Rio Tinto

Brockman 2 Transit Facility

all projects

Location

Brockman 2

Client

Rio Rinto

“Groundedhas successfully completed the installation of a new Lounge, Locker, and 56 shower Transit Facility to provide the outgoing RTIO staff members from theBrockman 2 Village the ability to prepare for their return trip home. Worksincluded the transformation of the existing carpark to facilitate the newfacility, including all in-ground services, Structural steel breezeway, Busshelter, and the landing and complexing of 17 building modules”

 

Specifics Include:

  • Design that strongly complements and recognises the traditional landowners of the region
  • Detailed earthworks
  • Concrete pads and pavement linking the facility to the existing camp
  • Structural steel and FRP covered breezeway
  • Structural Steel bus stop
  • Structural steel shelters and staircases
  • In ground electrical and hydraulic services connecting facility with existing services.
  • Landscaping and swales to disperse stormwater

View Project