In addition to the processing and camp infrastructure for the Iluka Resources Dandaragan project, Grounded were requested to build administration, storage and wastage facilities. The scope of works included:
- Design, construct and refurbishment of the site infrastructure area and utilities, including service connection and commissioning.
- Stormwater drainage design to local council regulatory requirements for the proposed impervious areas including ground level, end of line civil storage & connection points for hydraulic consultant’s roof drainage design
- Non-destructive overland flood route design for the site drainage system as per relevant Australian standards